Eskom has offered an assurance that there is no risk of loadshedding, after it confirmed that the two units at Koeberg nuclear power station are being operated at reduced power due to a line fault from the Pinotage transmission substation. It has also given the assurance the the station is operating safely and securely, and that all regulatory and operational protocols are being followed.