The Pretoria High Court confirmed, on May 3, that the environmental authorisation for the planned 600 MW KiPower coal-fired power station had expired, meaning the proposed power station cannot be built.
KiPower was intended to be built outside Emalahleni, in Mpumalanga – a region with poor air quality as a result an existing fleet of coal-fired power stations in the vicinity, Sasol’s coal-to-liquids plant in Secunda and the Natref refinery, in Sasolburg, notes environmental groups groundWork and the Centre for Environmental Rights.