Production from the Zinia Phase 2 short-cycle project, which is connected to the existing Pazflor’s floating production, storage and offloading (FPSO) unit in Angola, has started. The project is operated by petroleum refiner Total, which is the joint operator of Block 17 in Angola, together with the Angolan National Oil, Gas and Biofuels Agency.